modular building

A fast growing bioscience company based in Tempe, Arizona required a Certified ISO 8 cleanroom compliant with GMP guidelines to control the environment of a pharmaceutical packaging process.

decorative wall panel illustration

Project Overview

Application: ISO 8 Cleanroom with Gowning Room
Products:

  • Series 300 Wall Systems in 12' Height
  • FRP Fire & Sound Wall Panels
  • Integrated Sliding Doors

Benefits Provided:

  • FRP wall panels allowed for easy wash down
  • ISO 8 Certified and GMP compliant
  • Engineered for seismic
request a quote icon

The Challenges

  • First, existing space limitations would require installing the building in a very confined space.
  • Secondly, regional building requirements specified the need for seismic bracing.
  • Third, any solution would probably require the integration of a high-speed automatic door.
  • Finally, the fast growth of the company meant that a move or future expansion was imminent.
 
clipboard checklist illustration

The Evaluation

 

Modular vs. Traditional

The customer considered traditional construction as an alternative. However, they saw benefits to building with modular. Given their plan to relocate the facility in a few years, modular construction would allow them to relocate the cleanroom to their next facility.

modular cleanroom wall panels
 
cleaning and sanitization illustration

The Solution

 

Quick Installation with Minimal Disruption

PortaFab’s dealer provided expertise in designing and implementing a turnkey ISO 8 cleanroom; from initial specifying to the building permit and ultimate validation process.

Given the client’s need for secure access control, PortaFab incorporated a dealer-supplied motorized aluminum storefront door to handle the high number of door cycles, along with key pad access.  The motorized door fit within the Cleanrooms ISO 8 criteria.

Finally, PortaFab prepared structural calculations and professional stamped engineered drawings from a licensed engineer in Arizona to help with the local building permit process and address seismic conditions with the use of shear panels in strategic locations to control racking.

iso 8 cleanroom with motorized sliding doors

This website use cookies to improve our products and your experience on our website by evaluating the use of our website, products and services, to personalize content, to provide social media features and to analyze our traffic. We also share information about your use of our website with our social media, advertising and analytics service providers. By agreeing to the use of cookies on our website, you direct us to disclose your personal information to these service providers for those purposes.

For more information, please see our Privacy Policy and, if you are a California resident, our Privacy Notice to California Residents.